Client: Micheal Doyle Civil Engineering Ltd.
Location: Cloghaneleskirt Wind Farm
Project Details: Cable track grid connection.
Installation of 8.5km of duct from Cloghaneleskirt wind farm to sub station.
The scope of works included the following:
Installation of ducts, joint pits, roping and proving ducts.
4km installed along the public road.
4.5km installed through 6m deep bog with the help of our bog master excavators.