Client: Micheal Doyle Civil Engineering Ltd.

Location: Cloghaneleskirt Wind Farm


Project Details: Cable track grid connection.

Installation of 8.5km of duct from Cloghaneleskirt wind farm to sub station.

The scope of works included the following: 

  • Installation of ducts, joint pits, roping and proving ducts.

  • 4km installed along the public road.

  • 4.5km installed through 6m deep bog with the help of our bog master excavators.